A large electronics manufacturing firm that produces a single product is faced with rapid sales…

A large electronics manufacturing firm that produces a single product is faced with rapid sales…
 A large electronics manufacturing firm that produces a single product is faced with rapid sales growth. Its planning group is developing an overall capacity-expansion strategy, that would balance the cost of building new capacity, the cost of operating the new and existing facilities, and the cost associated with unmet demand (that has to be subcontracted outside at a higher cost).  The following model has been proposed to assist in defining an appropriate strategy for the firm. Decision variables  Yit                                      A binary integer variable that will be 1 if a facility exists at site i in period t, and 0 otherwise. (I Y )it                                A binary integer variable that will be 1 if facility is constructed at site i in period                                               t, and 0 otherwise.  Ait                                    Capacity (sq ft) at site i in period t.  (I A)it                               The increase in capacity at site i in period t.  (D A)it                              The decrease in capacity at site i in period t.  Pit                                     Total units produced at site i in period t. Ut                                      Total unmet demand (subcontracted) units in period t.                                           Forecast parameters Dt                                     Demand in units in period t.  Cost parameters–Capacity  sit                                      Cost of operating a facility at site i in period t.  dit                                     Cost of building a facility at site i in period t. ait                                      Cost of occupying 1 sq ft of fully equipped capacity at site i in period t. bit                                     Cost of increasing capacity by 1 sq ft at site i in period t. Cit                                    Cost of decreasing capacity by 1 sq ft at site i in period t.  Cost parameters–Production  Ot                                      Cost of unmet demand (subcontracting + opportunity cost) for one unit in period                                             t.  vit                                     Tax-adjusted variable cost (material + labor + taxes) of producing one unit at site                                             i in period t.  Productivity parameters  (pa)it                                Capacity needed (sq ft years) at site i in period t to produce one unit of the                                                       product. Policy parameters Fit, Fit                                 Maximum, minimum facility size at site i in period t (if the site exists). Git                                       Maximum growth (sq ft) of site i in period t.  Objective function The model’s objective function is to minimize total cost:   Description of constraints 1. Demand constraint  2. Productivity constraint  3. Facility-balance constraint 4. Area-balance constraint   5. Facility-size limits  6. Growth constraint  7. Additional constraints All variables nonnegative. Explain the choice of decision variables, objective function, and constraints. Make a detailed discussion of the model assumptions. Estimate the number of constraints, continuous variables, and integer variables in the model. Is it feasible to solve the model by standard branch-and-bound procedures? Apr 24 2022 07:43 AM

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
Open chat
1
You can contact our live agent via WhatsApp! Via + 1 (409) 205-8984

Feel free to ask questions, clarifications, or discounts available when placing an order.

Order your essay today and save 30% with the discount code GURUH